← Back to Fleet Database

CVA-01

UK Carrier Proposed/Cancelled Ships Tier 4 Power 97.92

## Specifications

Specifications

Displacement (std)
54500 t
Displacement (full)
63000 t
Length
924.9 ft
Beam
184.1 ft
Crew
2500
Ships built
0 (cancelled before construction)
Commissioned
Never (planned 1970s)

Performance

Top speed
30 kn

Armament

Torpedoes
None

Armor & Systems

Belt
None

In-Game

Tier
T4
Game power
97.92
Research cost
34,468
Credit cost
68,544

Historical source ↗